PLAN FOR

  • ARCHITECTURAL PLAN DRAWINGS

  • SITE PLAN

  • PERMITTING

Planning & Permitting Process

Requirements vary by location. All surveys, plans, permits, and municipal fees depend on your city/county and are billed separately from your construction quote. Construction timeline starts after permit approval.

Here is what to expect before we begin:

Step 1: Concept & Initial Estimate

  • What’s Included: Your Sequoia Design estimate includes a conceptual hand drawing of your project layout.

Step 2: As-Built Boundary Survey

  • Required Details: (if you have a survey, it may need to be updated with the details below)

    • Topography at 2' intervals

    • Tree locations labeled with size and species

    • All utilities labeled from street to house

  • Estimated Cost: ~ $2,000

  • Recommended Surveyors:

Step 3: Architectural Drawings & Site Plan

  • Why It’s Needed:

    • Architectural Drawings (~$1,950): Detailed structural plans showing building code compliance.

    • Site Plan (~$2,500): Uses your survey to map proposed structures and lot coverage calculations.

  • Recommended Design Partner:

Step 4: Permitting Submittal & Approval

  • Estimated Cost: ~$1,500 for processing & expediting (municipal permit fees are set directly by your city/county).

ARCHITECTURAL DRAWINGS & SITE PLAN.